Proposed Residential House built at Goba DSM
Residential · Goba Dar es Salaam · 2022

COMPLETED
Residential in Goba Dar es Salaam
Residential in Goba Dar es Salaam
Project overview
First floor ; 1masterbedroom,Lounge Ground floor ; Three Self contained rooms,Sitting room,Dining room, Kitchen room,Store,Public toilet. Project conducted in phases
Location
Goba Dar es Salaam
Client
Miss Hilda
Completion
2022
Size
22m × 15m
Solution
Results
Project images
Similar projects
Residential · Mwanagati DSM
Proposed Residential House built at Mwanagati DSM
Description First floor ; 1masterbedroom,Lounge Ground floor ; Three Self contained rooms,Sitting room,Dining room, Kitchen room,Store,Public toilet. Project conducted in phases
View details
Residential · Mwanagati DSM
Proposed Residential House and landscaping to be built at Mwanagati DSM
Basement; Car parking Ground floor ; Sitting room,Dining room,Kitchen,Store, Public Toilet First floor ; 1Masterbedroom, 3 Selfcontained rooms. Landscaping works and swimming pool outside . Project conducted in phases
View detailsReady to start your project?
Talk with a practical construction team about scope, cost, timeline, and the best next step.